Starbase saw Ship 41 complete an unusually long ~60-second six-engine static fire clearing a key Flight 14 milestone, the Gigabay reached its symbolic "topping out," and fresh paint plus official notices hint at a mid-September launch window.
This week's Starbase update was headlined by Ship 41, which rolled out at night from between the Mega Bays to Massey's test site—escorted by a Cybertruck holding traffic on Highway 4—and completed both a single-engine and an unusually long (~60-second) six-engine static fire. SpaceX officially confirmed the six-engine firing via X.com as a key milestone requirement cleared for the upcoming Flight 14, while framing the earlier single-engine burn as a legitimate deorbit burn test representing roughly the limit of what can be simulated on Earth before real flight data becomes available. Quieter but significant activity continued at Pad Two with post-flight systems checks following the successful Flight 13 mission, and new components began arriving for an orbital launch mount at Pad 1, with sandblasted structures receiving a fresh light-colored coat of paint. Construction reached a symbolic peak as crews lowered what appears to be the final structural beam into place atop the enormous Gigabay—a "topping out" moment honoring the Scandinavian tradition of marking completed structures in pride and gratitude for the builders—while its large doors and bridge crane infrastructure continued taking shape. With the fresh paint and official notices pointing to a potential mid-September launch window, the host signals Starbase is closing in on Flight 14, though the booster still needs to roll out and complete testing first, before thanking the workforce for their efforts in the intense Texas sun.
Load the full timestamped transcript on demand and click any time to jump in the video.